• Case study

Singapore Sports Hub, New Sports Complex Installation

Singapore Sports Hub, Kallang Singapore

The Singapore Sports Hub was completed in 2014, replacing Singapore’s National Stadium in Kallang. How do you design the AV systems for such a large and diverse facility?

The Symetrix DSP products were used on an epic scale this $1.06 billion Sports Hub development in Singapore.

Alongside the flagship 55,000-capacity National Stadium, the 35-hectare Sports Hub complex also includes a 6,000-capacity Aquatics Centre and 3,000-capacity Sports Arena, among other facilities. Audio specifications across the site vary considerably and feature products from manufacturers including EAW, Community Loudspeakers, Powersoft and Allen & Heath, but unifying all of these facilities is a digital audio philosophy based around Symetrix’s SymNet Edge open architecture Dante-enabled DSPs.

The games begin: Singapore Sports Hub Opens – InAVate Asia Pacific